November 19, 2026
The Central Park gate on Bee Cave Parkway opens at 8 a.m. and closes 30 minutes before sunset. In late November that leaves a short afternoon. The 1.5-mile Bee Cave Hike and Bike Trail passes through the park on its way to the Galleria, and Bee Cave on Ice opened behind City Hall on November 13. This season, the park and the city's holiday events sit on the same trail.
That connection also explains the city's next plan for the park. The project that has reached a cost estimate is an access drive with more parking, not the splash pad or the courts from the master plan. It is about getting cars in and out, the same thing that shapes a short winter visit now.
The park sits at 13676 Bee Cave Parkway, southwest of RR 620 South. The city lists it at 50 acres, with large and small pavilions, playscapes and restrooms. The adopted master plan counts what is already there: two playgrounds, a dog park, two pavilions, a basketball court, a mixed-sport field, walking and jogging trails, and places to watch birds. The fenced dog park has separate enclosures for large and small dogs, plus drinking water and shaded seating.
Parking is the tight spot. A May 2026 engineering presentation counted 62 spaces along a 25-foot concrete drive that doubles as the fire lane, according to Citizen Portal's meeting summary. The same presentation described erosion where a discharge pipe and riprap meet the trails and the dog park, near Freytag Creek. The parking and that creek crossing both come back in the city's plan for the park.
The paved perimeter trail inside Central Park is just over a mile long. The 2023 master plan measured the full path network inside the park at about 1¾ miles, or 9,150 feet. A lap of the perimeter fits easily into a short November afternoon, and the city's trail page lists restrooms, water fountains and shaded play structures along the way.
The longer walk uses the Bee Cave Hike and Bike Trail. This 1.5-mile multi-use route starts at Falconhead Boulevard, runs south along RR 620, passes through Central Park and continues to the Galleria. It links the RR 620 corridor, the park and the shops.
This season, the Galleria end of the trail is the busy one. Bee Cave on Ice is at 4000 Galleria Parkway behind City Hall and runs November 13, 2026, through January 18, 2027. The city lists Thanksgiving Day hours of 10 a.m. to 7 p.m. On publish day, the rink stays open well past the time the Central Park gate closes.
The Galleria calendar fills in after Thanksgiving. Light up the Plaza and the start of Photos with Santa are both on November 28. Santa photos run through December 24, and the Jingle Bell 5K is December 5. The Bee Cave Holiday Market runs Fridays, December 4, 11 and 18, and Saturdays, December 5, 12 and 19. The Bee Cave Farmers Market continues on Sundays from 10 a.m. to 2 p.m. in the Galleria's Central Plaza. All of these are at the Galleria, not in Central Park, and the park sits on the trail between them and the RR 620 end. For Lakeway's side of the season, see our guide to Lakeway's holiday events off Lohmans Crossing.
The Bee Cave City Council adopted the Central Park Master Plan on September 12, 2023. As Community Impact reported that October, the plan's proposed amenities include an all-abilities playground, a splash pad, five pickleball courts, five tennis courts and a community stage. The plan also proposes more parking, wider paths, internal drives, and connections toward The Backyard, the Burton Tract and a pedestrian bridge over SH 71. All of these are still plan proposals. Today's park is the one described above.
The project that has moved forward deals with access. The Bee Cave Development Corporation and the City Council approved an initial engineering phase in August and September 2025. Its scope covers driveway, parking, signage and striping, stormwater and water-quality improvements, according to Community Impact. In May 2026 the consulting engineers, Walter P. Moore, recommended Option 1b, a longer gated access road with more parking and culvert repairs, and estimated roughly 650 days for the work, Citizen Portal reported. At a July 27, 2026, update, city staff presented the final engineering report, which recommends Option 1b with a connection and one-way exit toward FM 620 at about $3.75 million including a 30% contingency. Staff said the report would be used to seek design services, per Citizen Portal.
Design comes first and construction follows, and the consultant's schedule runs close to two years. The plan adds a one-way exit toward FM 620 and more parking than the 62 spaces counted in May.
The budget has one more park item. The council approved the city's fiscal 2026-27 budget on September 22, Community Impact reported, and the adopted budget includes $77,285 for a line called "Irrigation Central Park." Separately, in February 2024 the city entered an agreement for the West Travis County Public Utility Agency to pay for and install reclaimed-water irrigation under the park, with the city maintaining the system, as Community Impact reported.
The shops and restaurants at the Galleria end of the trail are in our earlier look at how the Bee Cave week filled in this year, and the Bee Cave neighborhood guide covers the rest of the city.
If you're thinking about a Bee Cave home and want to know how close it sits to the Hike and Bike Trail or Central Park, Sarah McAloon can map it out with you. Schedule Your Personal Consultation and we'll look at the streets you have in mind.
Stay up to date on the latest real estate trends.
Ready to turn your real estate dreams into reality? Contact Sarah McAloon today for a stress-free and personalized home-buying experience!